[1]
A. Ahadi and S. F. Azar, “The study of the possibility of using activity-based costing system (ABC) (Case Study: General Directorate of Roads and Urban Development of East Azerbaijan Province)”, IAJAFM, vol. 3, no. 1, pp. 1–8, Jun. 2016, Accessed: Nov. 17, 2026. [Online]. Available: https://iaiest.com/iaj/index.php/IAJAFM/article/view/IAJAFM1510001